title card Interiors_07 15 2019.jpg
       
     
Floor Plan
       
     
Floor Plan with Details
       
     
Interior Elevation | Kitchen Wall
       
     
Super Pantry_DRAFT_02 07_2023.jpg
       
     
22 08 30 Ramones_rath_wine room.jpg
       
     
Restroom Elevations_05 18 2017.jpg
       
     
22 08 30 Ramone_rath_study_guest 7.jpg
       
     
Exterior Render New York Cafe
       
     
Exterior Render New York Cafe
       
     
Exterior Render New York Cafe
       
     
Tone Board & Materials - New York Cafe
       
     
Restaurant Planter Schedule - Los Angeles
       
     
Finish Schedule
       
     
African fabric lamp work order.jpg
       
     
Lamp 2 fabrics_resize.jpg
       
     
4619_001_lamp resized.jpg
       
     
shade beige work order_made.jpg
       
     
Pattern for accent blanket
       
     
blanket_4470.001.jpg
       
     
Pattern for accent Blanket
       
     
Final Product
       
     
blanket_4464.002.jpg
       
     
Accent Blanket for New York Hotel
       
     
IMG_5242.JPG
       
     
Full Red 24.JPG
       
     
title card Film_07 15 2019.jpg
       
     
Budget Detail - Set Decoration (Feature Film)
       
     
clearance log_americana 07 02 2019.jpg
       
     
Process and Production
       
     
Process and Production - Call sheet
       
     
Process and Production - Call sheet
       
     
Ann McKinnon_work_2023_mz (dragged).jpg
       
     
title card Interiors_07 15 2019.jpg
       
     
Floor Plan
       
     
Floor Plan

Space planning for Residential Project

Floor Plan with Details
       
     
Floor Plan with Details
Interior Elevation | Kitchen Wall
       
     
Interior Elevation | Kitchen Wall
Super Pantry_DRAFT_02 07_2023.jpg
       
     
22 08 30 Ramones_rath_wine room.jpg
       
     
Restroom Elevations_05 18 2017.jpg
       
     
22 08 30 Ramone_rath_study_guest 7.jpg
       
     
Exterior Render New York Cafe
       
     
Exterior Render New York Cafe

My Role:

Applied materials to existing 3D model using Rhino, Selected paint colors in line with design concept and tone. Cleaned up any inconsistencies within the 3D model.

Exterior Render New York Cafe
       
     
Exterior Render New York Cafe

Alternate option for exterior paint treatment. Used Rhino software to add color and texture to the existing 3D Model. Tracked changes and response from the client.

Exterior Render New York Cafe
       
     
Exterior Render New York Cafe

My Role:

Used Rhino software to add color and texture to the existing 3D Model. Tracked changes and response from the client.

Tone Board & Materials - New York Cafe
       
     
Tone Board & Materials - New York Cafe

My Role:

Sourced Materials, photographed selection for tone board to be sent to clients for approval. Managed material schedules as design progressed.

Restaurant Planter Schedule - Los Angeles
       
     
Restaurant Planter Schedule - Los Angeles

My Role:

Updated the existing landscaping plan using Autocad, XRefs, unified the planter sizing structure to create a cohesive environment, resulting in 8% savings on custom planter fabrication.

Finish Schedule
       
     
Finish Schedule

My Role:

Maintained the finish schedule as it corresponded to the detailed 132-page specification book. Made necessary revisions to both documents as the design progressed.

African fabric lamp work order.jpg
       
     
Lamp 2 fabrics_resize.jpg
       
     
4619_001_lamp resized.jpg
       
     
shade beige work order_made.jpg
       
     
Pattern for accent blanket
       
     
Pattern for accent blanket
blanket_4470.001.jpg
       
     
Pattern for accent Blanket
       
     
Pattern for accent Blanket
Final Product
       
     
Final Product
blanket_4464.002.jpg
       
     
Accent Blanket for New York Hotel
       
     
Accent Blanket for New York Hotel

My Role:

Photographed blanket pattern noting imperfections to be fixed and final sizing: Full, Queen or King. Tracked production of 45 unique accent blankets designed from recycled one of-a-kind textiles.

IMG_5242.JPG
       
     
Full Red 24.JPG
       
     
title card Film_07 15 2019.jpg
       
     
Budget Detail - Set Decoration (Feature Film)
       
     
Budget Detail - Set Decoration (Feature Film)

My Role:

Tracked daily department spends in credit card, cash or checks across 3 assistant shoppers, a leadman buyer for rigging and any purchases made on account via purchase order. Identified budget red flags due to schedule changes or location changes. Delivered weekly cost reports.

clearance log_americana 07 02 2019.jpg
       
     
Process and Production
       
     
Process and Production

Call sheets created and maintained for set decoration load in’s. This document used as a double check for each department to confirm that all set elements have been paid for and picked up. Leadman uses as a guide for logistics when loading trucks. Project often shooting and prepping in 4 separate locations each day.

Process and Production - Call sheet
       
     
Process and Production - Call sheet
Process and Production - Call sheet
       
     
Process and Production - Call sheet
Ann McKinnon_work_2023_mz (dragged).jpg